Pre-Season Snow-Melt Inspection Checklist

Phase 1: Electrical System Verification

Run these checks on a dry day each fall, before the first snowfall. A thirty-minute check prevents a blizzard-morning failure.

StepCheckPass Standard
1Junction boxes — inspect every box for watertight seals, clean terminations, tight connectionsNo moisture, no corrosion, no loose lugs
2Cold leads — verify conduit protection where leads emerge from the slabConduit intact, no exposed wiring
3Conductor resistance — digital multimeter, compare to the CSA label valueWithin -5% to +10% (some models ±15%)
4Insulation resistance — 500 VDC megohmmeter (Megger) testInfinite ohms — any reading means a breach
5GFEP breaker — confirm a dedicated 30mA trip breaker per circuit (NEC)30mA GFEP, not a 5mA GFCI
6Amp draw test — measure the live current per circuit15A breaker → max 12A; 20A → 16A; 30A → 24A; 40A → 32A
7Trigger voltage — verify the control relay panelClean signal, no voltage drop

Phase 2: Hydronic System Checks

CheckWhat to Look For
Glycol concentrationFreeze point must beat the coldest local design temperature; 30–50% propylene glycol
Fluid conditionCheck pH (corrosion), degradation, and impedance buildup in the mixture
Loop flushFlush if the fluid is dirty or the pH is off
Boiler & pump operationFire the boiler, confirm pump circulation, listen for air in the lines
Controls & sensorsTest automatic sensors; confirm the 38–39°F + moisture trigger logic
Pressure testHold system pressure; any drop = a leak to find before winter

Phase 3: Surface & Site Checks

The math that matters: variance = (measured − nominal) ÷ nominal × 100. Log it, date it, keep it — a drift toward the edge of the ±10% window is the first sign of a degrading element, and the only cheap moment to act is before the surface is buried under a foot of snow.